The extension works in our Serravalle warehouse have now been completed. The automated storage system adjacent to the warehouse is fully operational, with AGV vehicles transporting materials to all production departments. With these extension works, new offices were also realized for the direction and administration departments.
The warehouse was designed by the Matteini architecture firm, following the principles of green sustainable architecture. A geothermal power plant is used to assist the air-conditioning system of the warehouse. The already existing photovoltaic power plant has been boosted up and now it can cover approximately 100% of the warehouse requirements.